Verification Gap Ledger

All programs

Building Resilient Infrastructure and Communities

Federal Emergency Management Agency. Terminated, contested in court.

Required verification

2of 4

Estimated outcomes

What proof of results the program's rules require.

  1. Projects carry an ex ante benefit cost ratio, with 1.0 or greater treated as cost effective. This is a modeled estimate of avoided losses, not a measured result.

    OpenFEMA, Hazard Mitigation Assistance Projects v4field definitions: benefitCostRatio, netValueBenefits. Read 2026-10-10. Supports code 2. Confidence: medium.

Public results

4of 4

Open machine-readable project data

What results anyone can see, not counting award announcements.

  1. Project-level records including BRIC, with estimated benefit fields and status; bulk CSV, JSON and Parquet; API; updated daily.

    OpenFEMA, Hazard Mitigation Assistance Projects v4formats and API. Read 2026-10-10. Supports code 4. Confidence: high.

Attributability

1of 3

Baseline or modeled counterfactual only

Whether an outside party could link outcomes to the funding.

  1. Benefit cost analysis uses a modeled no-action baseline; no measured post-event loss avoidance in this dataset.

    OpenFEMA, Hazard Mitigation Assistance Projects v4benefitCostRatio definition. Read 2026-10-10. Supports code 1. Confidence: medium.

Program status

Terminated, contested in court. FEMA announced the end of BRIC on Apr. 4, 2025. On Dec. 11, 2025 a federal court ruled the termination unlawful and permanently enjoined it; as of Feb. 2026 no restoration timetable existed.