Energy Efficiency and Conservation Block Grant Program (IIJA)
U.S. Department of Energy. Active.
Required verification
2of 4
Estimated outcomes
What proof of results the program's rules require.
-
Recipients report one required primary metric per activity each quarter; IIJA metric set covers energy savings, cost savings, renewable generation and emissions reductions. Guidance does not require metered baselines or M&V, so metrics are treated as estimates.
DOE, EECBG BIL Reporting Guidance (Aug 2023)Sec. 4.3c; Attachments 1 and 2. Read 2026-10-10. Supports code 2. Confidence: medium.
-
Historical context: after GAO review, DOE stopped requiring ARRA-era recipients to calculate savings and instead estimated impacts centrally from reported activity data.
GAO-11-379, Recovery Act: EECBG (Apr. 7, 2011)Recommendations status. Read 2026-10-10. Supports code 2. Confidence: high.
Public results
0of 4
No public results
What results anyone can see, not counting award announcements.
-
Describes reports submitted to DOE; no public portal, dashboard or project-level outcome release found.
DOE, EECBG Award Management and Reporting pagewhole page (modified 2026-07-20). Read 2026-10-10. Supports code 0. Confidence: medium.
Attributability
0of 3
No baseline
Whether an outside party could link outcomes to the funding.
-
No baseline data requirement identified.
DOE, EECBG BIL Reporting Guidance (Aug 2023)Sec. 4.3. Read 2026-10-10. Supports code 0. Confidence: medium.